Temporary-structure engineering · New York City and New Jersey
Stamped, filed, approved. In days.
Sidewalk sheds, scaffolds, hoists and overhead protection designed by a licensed Professional Engineer and filed in DOB NOW. Based in North Jersey, working across all five boroughs and the tri-state area.

Numbers you can check in DOB NOW
Three numbers.
100+
Sidewalk shed, scaffold, hoist and protection filings in New York City in 2026, as applicant of record.
3 Days
Average DOB permit time measured by PermitPipeline, against a citywide median of 32 days (October 2026).
7 states
Professional Engineer licensure, with New Jersey and New York as home ground.
Services
Everything on a Chapter 33 site, sealed and filed.
Sidewalk sheds
Heavy-duty and light-duty sheds, cantilevers, sheds over vaults, Local Law 48 renewals.
Roof protection and fences
Roof and overhead protection, construction fences and rooftop enclosures.
Local Law 48 renewal reports
The engineer’s progress report each 90-day sidewalk shed renewal has required since August 2026.
How we work
Three steps. No account layer.
You talk to the engineer.
The licensed PE who seals the drawings is the person on the phone.
Drawn to be built.
Drawings follow your system and inventory, bay by bay, with the parts the crew actually carries.
Filed in days, not weeks.
Standard scopes are drawn, sealed and filed in DOB NOW within about three business days of receiving site information.
Recent work
Six of this year’s filings.
Request a proposal
Send the address, the structure type and your date.
We reply within one business day. Call 201-658-1430 or email info@nomadrd.com.
